TECHNICAL

45 Units Installed -25 Weeks

The Construction

CITI MODULAR 

Less Than 2 Weeks 

 

Traditional 

Construction 

12-16 Weeks

 

Each CITI Modular Home internals specification is bespoke to each client's requirements. Requirements such as disabled, student, refugee, military, social housing - short and long term are all provided along with energy saving installations and technology. Carbon Neutral can be achieved.

 

CITI Modular Homes can be manufactured to form larger associated units and even multi-storey singular units (Duplex). The possibilities are endless.

 

Developments up to 4 storeys can be installed on screw piles, saving on installation costs and time. Using non-intrusive foundations means developments on Brownfield and/or contaminated sites can be considered without the associated remediation costs.

 

CITI Modular Homes are plug and play and only need connecting to services on site, to become fully operational. Minimal site works are needed to install any CITI Modular Home.

 

CITI Modular Homes are manufactured whilst the site preparation works are underway, saving time and capital investment.  Up to 70% time savings from date or order to occupation are possible.

 

CITI Modular Homes are manufactured with exacting precision. On-site conditions affecting quality and progress are eliminated (weather, wastage, site conditions etc). Due to the precise manufacturing process, CITI Modular Homes are ideal for medical facilities where cleanliness of the product is assured.

THE TECHNOLOGY

The structure and roof comprises 142 mm or 172 mm thick structural insulated panels (SIPs) with a high-performance fibre-free rigid urethane insulation core, sandwiched between two layers of 15mm Oriented Strand Board type 3 (OSB/3

 

  • Carbon Neutral can be achieved using composite products.

  • BBE Certified components - 60 years plus lifespan

  • Fire resistance of up to 60 minutes

  • The panel nature of the System enables a fast track building process, which  reduces construction time

  • Defects are vastly reduced due to factory controlled manufacturing, precise engineering and the design of the System

  • Simultaneous on/off-site works

  • Reduced on-site works

  • Simple and accurate cost forecasting and management

bottom of page